Projects



American Airlines Training Complex - Grand Prairie, TX

Place and finish 3,000,000sf. + building slabs and garages


Love Field Parking Garage - Dallas, TX

Place and Finish 2,000,000sf. of cast in place garage slabs


Rosewood Garage - Dallas, TX

Place and finish cast in place garage and high end condominium slabs


DL Rogers Corporate HQ - Grapevine, Tx

Turnkey installation of foundations and site concrete

Place and finish of elevated building slabs


Terraces @ Douglas - Dallas, TX

Place and finish cast in place garage slabs and office building above  


UTSW Medical Building and Site Paving Package – Dallas, Tx

Cast in place concrete for all building slabs and flatwork for the new hospital

Turnkey site setup, place and finish for 400,000sf. + paving


UTSW Medical Building Parking Garages – Dallas, Tx

Cast in place concrete for East and West parking garages 


SuperTarget 

Highway 75 @ Stacy Rd. - Allen, TX

Construction of a new Target retail facility consisting of 190,000sf. of retail and 55,000sf. of tilt wall panels constructed using a 1/2" thick brick, cast monolithically into the face of the concrete panels


SuperTarget Store T-2425 

I30 @ Green Oaks Rd. - Ft. Worth, TX

Construction of a new Target retail facility consisting of 125,000sf. of retail


SuperTarget 

I 20 @ Wheatland Rd. - Dallas, TX

Construction of a new Target retail facility consisting of 125,000sf. of retail



Current or Recently Completed




Turnpike West Warehouse – Dallas, Tx

300,000sf of Ff50-Fl35 slabs on grade, tilt wall panels, paving and sidewalks


Hobby Lobby – Plano, Tx

50,000sf of slabs on grade, tilt wall panels with brick inserts cast in panels, paving, and sidewalks


One Legacy Tower – Plano, Tx

360,000sf. of cast in place concrete building slabs and flatwork

380,000sf. of cast in place garage slabs and topping on precast T’s


Victory Skyhouse I & II - Dallas, Tx

2- 25 story high rise condominiums – 350,000sf. of  cast in place concrete 


1920 McKinney Avenue, Dallas, Tx

157,000sf. of cast in place concrete building slabs and flatwork

233,000sf. of cast in place parking garage slabs 

Colored and decorative exterior flatwork


FAA Headquarters – Ft. Worth, TX

Turnkey setup and place concrete for all flatwork for the site paving


TCU – Amon G. Carter Stadium Redevelopment

Ground up construction of the Southeast side of the new stadium and attached site work.


Whole Foods Market

Uptown – Dallas, Tx (Completed 2015)

Cityline – Richardson, Tx (Completed 2014) 

Bee Cave, Tx - Completed 2012

Fairview, Tx – Complete 2010

Lakewood, Tx – Completed 2009

Highland Park, Tx

Greenville, Ave – Plano, Tx

Preston Rd. and Forest Ln – Dallas, Tx

Turnkey concrete for slabs, paving, sidewalks, and foundations 









Whole Foods Market – Lakewood

Abrams Rd. & Gaston Ave., in Dallas, TX

Briefly: Remodel of an existing grocery store into a Whole Foods Market, whereby existing, damaged floors,paving, and sidewalks, were removed and replaced with a diamond ground floor slab, new paving, decorative sidewalks, and a sitting area; with enough "Green" construction planning to earn LEED certification


Advocare Distribution Center - Dallas, TX

Place and finish 300,000sf. of slabs plus tilt wall panels and surrounding paving and sidewalks


Sam's Club - Burleson , TX

Place and finish slabs on grade to meet specific Ff-Fl criteria using ACI certified finishers


Dallas Country Club – New Clubhouse

New Clubhouse, parking lot paving and pool deck, with multiple decorative finishes


University of Texas @ Arlington Student Housing Facility

2 Cast in Place, multi – level parking garages and, 5 multi - level Dormitories 


Midland Memorial Hospital – Midland, TX

Labor to place and finish concrete flatwork on multiple stories on a new hospital.


DISD Bid Package 60

Renovation / Expansion of 4 existing Schools in the DISD school system


Tarrant County College - Downtown Campus

A multi-level cast in place, architecturally finished, exposed concrete structure built to suit the growing needs of Tarrant County College district


Southern Methodist University – Caruth Hall

Labor to place and finish concrete flatwork 


Courtyard by Marriott and Conference Center – Allen, Tx

Briefly: Place and finish concrete for a multi-story Marriott hotel